Monday, September 12, 2011

Alakanuk from Air





This is the airport we use right now, while the new one is still being built. The village is behind it.


This is what the construction for the new school looks like right now. They have to ship in the gravel from Nome which takes about 18 hours by barge.

2 comments:

  1. This is so neat to see with all the summer green! Everything was so white and vast in March--this looks so different. A very pretty green for September! And I didn't picture that much water around although I don't know why not when you use all the ice for snowmachine roads.

    ReplyDelete